Commit Graph
4 Commits
Author SHA1 Message Date
Lainandlain f04326d1b7 docs(adr-0003): record lab config, tf card, and license inventory (#15)
Bounded doc/evidence package completing the three currently-satisfiable
ADR-0003 acceptance items.

## Artifacts
- `_doc/lab/board-c1810c76790e.json` — machine-readable lab config:
board identity (product/module/board_id + photo shas recomputed), ST7305
display (SPI3 mode0 10 MHz, pin map), I2C (PCF85063@0x51, SHTC3@0x70),
KEY GPIO18, SDMMC 1-bit TF (no card-detect, FAT32), software locks (IDF
v6.0.2, xtensa gcc 15.2.0, clang-format CI-18 authority),
current-firmware hashes cited from the M1 and PoC-A manifests.
- `_doc/licenses/INVENTORY.md` — license inventory for both ADR-0003
sources: Waveshare official repo @`eb1f6342` (root Apache-2.0 + bundled
SensorLib/U8g2/LVGL/codec components, each read from its LICENSE at the
pinned commit; reference-only, nothing vendored) and the vendored
elf_loader v1.3.3 @`6526c5b1` (Apache-2.0, license.txt sha `cfc7749b…`
recomputed) + managed dep cmake_utilities 0.5.3 (Apache-2.0 verified
from the local component cache zip).
- `_doc/decisions/0003-waveshare-rlcd42-hardware.md` — checkboxes ticked
only where in-repo evidence exists, each with a citation: boot record
(M1-002 + N16R8 marking photo), lab config, PCF85063/SHTC3/KEY (M1-004),
Flash/PSRAM mode (boot.log QIO/80 MHz/octal + manifest sdkconfig sha),
license inventory. TF model/capacity NOT found in M1 evidence (device
never logs card name/CID) → `tf_card: pending-visual-read`, TF checkbox
honestly left open. Status stays Blocked (fixture + spare board).

## Gates
- `frame-doc-links`: green (clean worktree; local `.omo/plans` noise is
gitignored harness state, CI unaffected)
- `pytest`: 87 collected, 0 failed (86 passed + 1 pyserial-environment
skip, documented steady state)
- `python3 -m json.tool` on the new JSON: OK

No code or firmware changes.

Co-authored-by: ania-lain <[email protected]>
2026-09-07 20:34:20 +08:00
Lainandlain e71842aa8a feat(poc-a): gate-a dynamic elf proof of concept (#13)
## Summary

PoC-A proved that dynamically loaded ELF plugins are workable on
ESP32-S3: plugins ship as signed MPB packages, are parsed by a strict
single-type parser shared between host and target, and execute from
PSRAM+IRAM within a measured admission budget. A 1000-cycle load/unload
soak passed 18/18 trend gates with stable heaps, the capacity ladder
settled at 8 coexisting plugin instances with a 3356B per-instance
budget, and the fail-closed corpus executed zero attacker-controlled
bytes across 14 rejection classes. Scheduler semantics (strand FIFO
ordering, completion-cancel CAS, quiesce-as-noop ABI) were validated on
both host (TSan suite) and target. **Gate-A verdict: PASS** — ADR-0002
moves to **Accepted** with the capacity value 8 and global-sum admission
rule as PoC-derived proposals.

## Changes by area

Grouped from `git log main..HEAD --oneline` (18 commits):

- **Vendored loader + patches**: `4bb53f2` vendor elf_loader 1.3.3 +
harness scaffold; `2f67b4f` plugin_iram loader patch with budget
consistency (p1-p5 patch series in `PATCHES.md`).
- **MPB toolchain**: `4793cc2` deterministic MPB manifest builder with
test signing; `408df44` strict single-type MPB parser shared
host/target; `796f9d2` host MPB corpus + policy CI lane.
- **Plugin pipeline + probes**: `21d2842` plugin pipeline and first
PSRAM execution on target; `cab9664` relocation/import allowlist matrix
with probes; `c5d6c6c` C++ feature rejection matrix.
- **Harness commands**: `e0e7159` generation coexistence with measured
admission budget; `2a37556` thousand-cycle lifecycle soak with heap
trend gate; `093a72b` on-target scheduler semantics validation (+
`eea3876` clang-format-18 sweep); `a302151` capacity ladder with signed
budget; `f34dc72` fail-closed corpus with execution sentinel.
- **Host prototypes**: `6198bca` strand FIFO prototype with TSan suite;
`1c3ad59` completion-cancel CAS and cleanup semantics.
- **Evidence + ADR/docs**: `887d0f7` Gate-A manifest and report;
`1c29e8a` ADR-0002 outcome + frozen PoC values.

## QA evidence

- `poc/evidence/poc-a-20260901/manifest.json` — 67-artifact hash index,
every sha256 recomputed at assembly.
- `poc/evidence/poc-a-20260901/GATE-A-REPORT.md` — full nine-item
development-plan §4 mapping; TEST-003 10/10 clauses.
- 14 verbatim per-task transcripts (`task-1` … `task-15-*.log`) + fresh
build artifacts (`build/frame_poc_a.map`, size components).
- Frozen in-repo references: `ALLOWLIST.md`, `REJECT-MATRIX.md`,
`ADMISSION-BUDGET.md`, `soak_samples_1000.csv`, fc corpus (33 committed
`.mpb` containers).
- F1-F4 final-wave verdicts: **APPROVE**.
- Key numbers: soak **18/18** trend gates over 1000 cycles; capacity
**8/8** instances, **3356B** per-instance; fc corpus **14 rejection
classes, zero attacker bytes executed**; **4 upstream loader defects
found and patched** (p1-p5).

## Requirement IDs (GOV-006)

ADR-0002; TEST-002, TEST-003; PLUG-001, PLUG-004, PLUG-008, PLUG-009;
MEM-001, MEM-003, MEM-007, MEM-008; LIFE-001, LIFE-002, LIFE-005,
LIFE-007; SEC-002, SEC-003, SEC-004, SEC-005; GH-003; GOV-004, GOV-005.

## Risks / known limitations

From `GATE-A-REPORT.md` §(f) plus the trade-off table:

1. **Capacity descent path 7-5 unexercised** — rung 8 passed first
attempt; rungs 7/6/5 and retry-once logic never ran on hardware
(untested against real OOM).
2. **No Wi-Fi in the harness (MEM-001 caveat)** — all PSRAM/IRAM budget
numbers are radio-off harness-class; product admission budgets must be
re-measured with the network stack active.
3. **On-target scheduler vectors are a subset of the host suite**
(256-node pool / 2e4 storm posts vs host 31000 / 1e5); consistency
declaration covers only the vectors actually run.
4. **Quiesce is a no-op by ABI semantics** — plugin ABI 1.2 has no
quiesce slot; NULL entry is defined as trivial success; real quiesce
coordination is later-gate work.
5. **MEMPROT=n trade-off** — `CONFIG_ESP_SYSTEM_MEMPROT=n` is required
for the IDF exec heap (`MALLOC_CAP_EXEC`) that `.plugin_iram` needs;
software-only PMP config, no eFuse burned (documented in `PATCHES.md`
p5); production must re-decide security vs plugin IRAM.
6. **Owner sign-off PENDING** — Gate-A PASS is the PoC team's verdict;
formal acceptance of ADR-0002 awaits the owner.

## Not in scope

- Product components (GOV-004) — this PR is PoC evidence only; no
product code paths change.
- **Merge is the owner's call** — do not merge without owner sign-off on
ADR-0002.

---------

Co-authored-by: ania-lain <[email protected]>
2026-09-07 20:02:18 +08:00
Lainandlain d53c56ab95 docs(adr): fill ADR-0002 loader candidate matrix from verified research (#11)
## Requirements (GOV-006)

- **ADR-0002** — replaces the TBD candidate matrix with three verified
candidates (espressif/elf_loader v1.3.3 primary, igrr/hotreload 0.10.0
secondary/pattern source, self-built contingency) plus per-candidate
evaluation evidence, correction log, and candidate priority. Status
remains Blocked per development-plan L1: the ADR is only Accepted after
full PoC-A evidence.
- **TEST-003** — Selection Rule Review adds one clarification probe item
for PoC-A: elf_loader's narrow relocation allowlist
(RELATIVE/RTLD/GLOB_DAT/JMP_SLOT) couples plugins to its project_so link
flags; this is verified as the TEST-003 relocation-allowlist probe, not
a rule change.
- **GOV-006** — this PR cites the impacted requirement/ADR IDs; research
method: librarian primary-source verification 2026-08-31
(repository/commit/issue/doc URLs recorded in the ADR); corrections
logged (espressif/esp-elf-loader 404, ARMAnt no results,
R_XTENSA_REGISTER nonexistent).

## Scope

- Only `_doc/decisions/0002-elf-loader.md` changes; no code, no plan
checkboxes.
- `uv run frame-doc-links` green; all new links are external http(s).
- Gate Impact appends the PoC-A candidate line (primary =
espressif/elf_loader v1.3.3+).

Co-authored-by: ania-lain <[email protected]>
2026-08-31 19:03:42 +08:00
lainandSisyphus dbb7c13729 docs: add v4.2 requirements, plan, and hardware ADRs
Add the v4.2 working documentation set under _doc/:

- requirements-v4.2.md and project-v4.2-draft.md (architecture draft)
- development-plan.md, project.md, README.md (index/navigation)
- decisions/: hardware architecture decision records backing the
  milestone gates (ST7305 display, PCF85063 RTC, SHTC3 sensor,
  TF-card JSONL evidence, KEY input, power/boot policy)

Ultraworked with [Sisyphus](https://github.com/code-yeongyu/oh-my-openagent)

Co-authored-by: Sisyphus <[email protected]>
2026-08-31 08:00:31 +08:00